Electrical & energy engineering · Cyprus

PV and battery storage, connected to the grid properly.

From the EAC/DSO application and single-line diagram to the meter, the export limiter and the RTU, we handle the engineering that gets your PV or storage system approved, connected and running.

  • EAC/DSO ready
  • On site across Cyprus
  • Remote support

PV and storage projects rarely stall on the panels. They stall on paperwork, protection, metering and communications. That is the part we take care of.

Services

Everything between the system and the grid connection.

01

Grid-connection applications

EAC/DSO applications and technical files for PV and storage systems, prepared under the current grid-connection rules and followed through to approval.

02

Single-line diagrams & CAD

SLDs, panel and switchboard specifications and DXF/CAD drawings, including redrawing old or scanned panel drawings into clean, editable files.

03

Metering & zero-export control

Energy meters, CTs and export limitation, so the system respects its approved export limit. Experience with Eastron meters and Huawei SUN2000 inverters with SDongle.

04

RTU & Modbus integration

RTUs for DSO/TSO monitoring and setpoint control, Modbus RTU and TCP mapping between inverters, meters and controllers, with Elseta WCC Lite experience.

05

Automation & PLC

Small control systems with Siemens LOGO! and similar PLCs for load control, switching logic and interlocks around generation and storage.

06

Remote access & commissioning

On-site wiring, configuration and commissioning, then secure remote access so issues can be checked and fixed without a site visit.

Monitoring & control

Approved is one thing. Staying within the limits is another.

After connection, the system has to keep to its export limit and answer the grid operator. We set up the metering, control and communications that make that automatic.

  • A

    Export limitation

    A meter at the connection point tells the inverters how much they may export, second by second, including zero export.

  • B

    Grid-operator signals

    The RTU passes measurements to the DSO/TSO and applies their setpoints to the inverters and the battery.

  • C

    Remote access

    Secure remote connection to loggers, meters and controllers, so most faults can be diagnosed without a site visit.

How we work

One engineer, from paperwork to commissioning.

  • The person who draws the SLD also wires and configures the system.
  • Hands-on with live equipment, on site across Cyprus.
  • Works with the equipment you already have, from any major manufacturer.
  • Documents and support in Greek and English.
01

We look at the site, the existing installation, the equipment and what the grid operator requires, and agree what the system must do.

Contact

Planning PV or storage? Let's talk.

Tell us about your project and we'll get back to you.